Gerakan Kontra Pembangunan Shelter 9 Dan 10 Pltu Suralaya Merak-Banten

Nida Urrohmah, Karin Caroline Kelly, Fitri Yuliani

Abstract


Electric Steam Power Plants (PLTU) need coal as fuel to produce electricity. The higher the electrical energy needed to eat, the more fuel will be used. This has happened in the construction of shelters 9 and 10 Suralaya Merak-Banten steam power plant (PLTU). This development is reaping various kinds of rejection because it causes environmental damage not only in the area around the development operation but also in the Greater Jakarta area. The rejection movement was initiated by local residents and supported by international Environmental NGOs.


Pembangkit Listrik Tenaga Uap (PLTU) membutuhkan batu bara sebagai bahan bakar untuk menghasilkan energi listrik. Semakin tinggi energi listrik yang dibutuhkan makan akan semakin banyak bahan bakar yang digunakan. Hal ini terjadi pada pembangunan shelter 9 dan 10 PLTU Suralaya di pulau Jawa spesifiknya di daerah Merak-Banten. Pembangunan ini menuai berbagai macam penolakan karena mengakibatkan kerusakan lingkungan tidak hanya pada wilayah sekitar operasi pembangunan namun juga pada wilayah Jabodetabek. Gerakan penolakan diinisiasi tentunya oleh warga setempat dan didukung dengan NGO Internasional penggiat isu lingkungan.

 



Keywords


gerakan kontra, pembangunan, PLTU Suralaya

Full Text:

PDF (137-150)

References


Arefana,sP.s(2019).sAbusLimbahsPLTU Suralaya Banten Be terbangan, Warga Sekitar Resah. Diperoleh dari suarabanten.id pada 16 Maret 2020:

https://banten.suara.com/amp/read/2019/11/29/085900/abu-pltu-suralaya-banten-beterbangan-ancam-nyawa-balita

Bakoro,aGalih Honggo.d(2013).dPLTU Batubara:dAntara Solusi Krisis Listrik dengan Isu Pencemaran Lingkungan (Studi Kasus Pada PT PLN (Persero) Unit Pembangkitan Jawa Bali). dJurnal General Bussines Environment Vol 1 No 2.

CNN Indonesia.d(2019).dWarga BantendMinta Korsel Hentikan Pendanaan PLTU Jawa 9. Diperoleh dari CNN Indonesia pada 16 Maret:

https://www.cnnindonesia.com/nasional/20190829221805-20-425949/warga-banten-minta-korsel-hentikan-pendanaan-pltu-jawa-9

Erman, Ed (2010).dAktor,aakses dan politik lingkungan di pertambangan timah Bangka. Masyarakat Indonesia,a36(2),a71–101. https://doi.org/10.14203/jmi.v36i2.640.

Feretic, D.,adan Tomsic, Z.a(2005).aProbabilistic analysis of electrical energy costs comparing: Production costs for gas, coal and nuclear power plants.aEnergy Policy, 33(1), 5–13. https://doi.org/10.1016/S0301-4215(03)00184-8

Greenpeace.a(2015).aHuman Cost of Coal Power:aaHow Coal-Fired Power Plants Threaten the Health of Indonesians. August, 1–32.

Tempo. (2018).aPLTU Siralaya Tak Miliki Izin Pengelolaan Limbah.aDiperoleh dari Koran Tempo pada 16 Maret:ahttps://koran.tempo.co/read/nusa/18414/pltu-suralaya-tak-miliki-izin-pengelolaan-limbah

Moleong, Lexy J.a(2007).aMetodologi Penelitian Kualitatif.aBandung:aPT Remaja Rosda Karya Offset.

Prasetya,aAndina dan Yogi Suprayogi.a(2019).aIsu Gerakan Sosial Baru:aTempat Nasi Gratis Bandung.aJurnal Pemikiran dan Penelitian Sosiologi.aVol. 3. No. 2

Ruzal,aM.aY.,aSyafuan, R.,adan Azrai,aH.aA.a(2009).aA Caleidoscope of Environmental Security:aIndonesian and Malaysian Perspectives.aJakarta:aMadani Press.

S.aJulianti,adan Jamaluddin,dAmiruddin.d(2018).dDampak Keberadaan Pembangkit Listrik Tenaga Uap (PLTU) Terhadap Kondisi Sosial Ekonomi Masyarakat di Kelurahan Panau Kecamatan Tawaili.dJurnal Elektronik Geo Tadakulo Vol.d6 No. 2

Singh,dRejedra.d(2007).dGerakan Sosial Baru.dPenerjemah Eko P.dDarmawan.dYogyakarta: Resist Book.

Situmorang,ddan Wahib,dA.d(2007).dGerakan Sosial:dTeori dan Praktik. Yogyakarta:dPustaka Pelajar.

Suharko.d(2006).dGerakan Sosial Baru di Indonesia:dRepertoar Gerakan Petani.dJurnal Ilmu Sosial dan Ilmu Politik Vol.d10 No.d1

Winch,D.M.,Baumol, W. J., dan Oates,W. E.(1976).The Theory of Environmental Policy.The Canadian Journal of Economics,9(1), 200. https://doi.org/10.2307/134432

Xue,Z.,Hao, J.,Chai,F.,Duan,N.,Chen,Y.,Li, J.Chen,F.,Liu, S.,dan Pu, W. (2005). Air Quality Impact of the Coal-Fired Power Plants in the Northern Passageway of the China West-East Power Transmission Project. Journal of the Air and Waste Management Association, 55(12), 1816–1826. https://doi.org/10.1080/10473289.2005.10464781




DOI: https://doi.org/10.37950/ijd.v2i2.54